Benchmark of Green Power, First Choice for Bulk Cargo Transport

Customization: Available
After-sales Service: Available After-Sale Service
Warranty: 12month

Product Description

📋 Overview
Model NO. ruihang756 HS Code 8901908000
Specification Length 150m * Width 23m * Draft 11m Origin China
Transport Package 150m * 23m * 11m Capacity 30 pieces / Year
Package Size 15000.00cm * 2300.00cm * 1100.00cm Gross Weight 400000.000kg
🚢 Methanol Tanker Dry Cargo Ship

The Methanol-fueled Bulk Carrier is a specialized bulk cargo vessel powered by methanol fuel. Its core power system is adapted to the combustion characteristics of methanol, combining the large load capacity of traditional bulk carriers with the environmental protection attributes of new energy ships. Compared with fuel-oil bulk carriers, the methanol power system has lower operation costs and its fuel supply network is gradually improving, making it one of the core equipments for the low-carbon and sustainable transformation of the shipping industry.

🚀 Applications
Bulk Dry Cargo Transport: Suitable for transoceanic and coastal transportation of coal, ore, grain, and fertilizers (20,000 to 250,000 DWT).
Environmentally Sensitive Routes: Priority application in regional routes with strict emission requirements (EU and North America).
Long-term Contract Logistics: Stable environmental performance for energy groups and mineral enterprises.
Methanol Tanker
⚙️ Key Configurations
Video Cover
🔹
Methanol Dual-fuel Engine: High-pressure common rail system allowing flexible switching between methanol and diesel.
🔹
Specialized Storage: Corrosion-resistant fuel tanks with leakage monitoring and preheating devices.
🔹
Efficient Cargo Handling: Large grabs and hydraulic hatch covers for rapid loading and unloading.
📊 Technical Specifications
Length Overall (LOA)150m Width23m
Depth11m Draft8m
Deck Load Capacity20–3200 tons Personnel Capacity8–250 persons
Main Engine Power1000–25000 kW Fuel Tank Capacity500–12000 m³
Maximum Speed10–18 knots Economic Speed8–12 knots
Endurance Range3000–15000 nmi Operation Time24-hour non-stop
Right Elevation

Right Elevation

Left Elevation

Left Elevation

Front Elevation

Front Elevation

🛠️ After Sales Service

Standard Warranty: 12 months or 2,000 operating hours.

Extended Warranty: Optional coverage up to 36 months.

Global Support: 24/7 technical assistance and spare parts supply.

Training: On-site or remote operation and maintenance training.

🏭 Professional Capabilities
Shipbuilding Factory

Industry Certifications

CCS Full-Process Factory Certification
Hazardous Chemical & New-Energy Vessel Qualification
ISO 9001 / 14001 / 45001 / 50001 Certified

Why Choose Our Engineering?

OEM/ODM capabilities & Turnkey project solutions
Competitive pricing & Fast shipping support
Specialized in Methanol & LNG powered vessels
Production Detail
Quality Control
Frequently Asked Questions
Q1. Can the vessel be customized to specific dimensions?
Yes, our engineering team provides tailored designs to meet specific project requirements, including length, draft, and cargo capacity adjustments.
Q2. How does the methanol dual-fuel engine work?
The engine uses a high-pressure common rail system that allows seamless switching between methanol and diesel, ensuring power stability even in different fuel supply conditions.
Q3. Do you provide after-sales service in overseas regions?
Yes, we provide 24/7 global technical assistance and have partnered service centers in key maritime regions for maintenance and spare parts supply.
Q4. What documents are provided for international export?
We provide a full export package including the Commercial Invoice, Packing List, Bill of Lading, Certificate of Conformity (COC), and necessary CCS certifications.
Q5. What are the advantages of methanol over traditional fuel?
Methanol significantly reduces carbon, sulfur, and nitrogen emissions, helping shipowners avoid emission taxes and comply with strict environmental regulations like those in the EU.
Q6. What is the typical lead time for a custom build?
Production capacity is approximately 30 pieces per year. Specific lead times depend on the vessel complexity and current order book; please contact us for a detailed project timeline.

Related Products