LSAW Steel Pipe for Oil and Gas Pipeline with 3lpe Coating

Still deciding? Get samples of $ !
Request Sample

Product Description

Basic Specifications
Model NO.
Weld Steel Pipe
Usage
Pipeline Transport, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Chemical Industry, Construction
Standard
Spec 5L Psl1/ Psl2, ASTM A252, En10219, Awwa C200
Outer Diameter
219.1mm - 4064mm (8" - 160")
Wall Thickness
4 mm - 25.4mm
Process
SSAW LSAW
Surface
Bare, HDG, Fbe, Paint, 3PE, 3PP, etc
Production Capacity
500,000 tons/Year
Product Overview
Steel Pipe Overview

We provide comprehensive full-chain pile foundation solutions, covering every stage from material sourcing and manufacturing to construction and maintenance. Our services encompass welded pipe production, anti-corrosion treatments, steel fabrication, equipment supply, design, and installation for marine, bridge, urban, and infrastructure projects worldwide.

Core Product Matrix
  • Pile Foundation: Steel pipe piles, H piles, steel sheet piles, PVC sheet piles
  • Foundation & Drilling Tools: Casing, casing joints, casing shoes, helical screw piles, core barrel, drilling bucket
  • Support Systems: Excavation steel shoring systems, combined wall systems, connectors and tie rods
  • Value-added Services: Galvanizing and anti-corrosion coating treatments, full-process engineering support
Steel Pipe Specifications
Steel Pipe Details

Steel pipes are a widely utilized type of deep foundation material in construction projects, offering outstanding load-bearing capacity and structural stability. We integrate advanced steel grades and precision manufacturing to ensure dependable performance.

Pipe Type Seamless ERW LSAW SSAW Roller Welded
OD (mm) 10.3 - 914.4 21.3 – 660.4 355.6 – 1828.8 219.1 – 4064 355.6 – 7000
WT (mm) 1.0 - 120 1.5 - 22.2 8 - 50 5 - 30 8 - 230
Manufacturing Process
Quality Assurance & Logistics
Logistics Solutions
Quality Testing
Comprehensive Testing Capabilities:
• Chemical Composition Analysis
• Mechanical Property Testing
• Ultrasonic Testing (UT)
• Radiographic Testing (RT)
• Magnetic Particle Testing (MPT)
• Hydro Static Testing
Fabrication & Project Support
Fabrication
Steel Structure

Our steel structures are essential for building construction, including beams, columns, tanks, and offshore platforms. We support vital infrastructure such as subway tunnels, bridges, ports, and stadiums.

Project Support
Frequently Asked Questions
Q1: What types of pipes do you supply?
A: We supply seamless and welded (ERW/LSAW/SSAW/Roller Welded) carbon and alloy steel pipes for oil/gas, construction, water treatment, and infrastructure projects.
Q2: Are your products certified?
A: Yes. We comply with SPEC 5L, 5CT, 2B, ASTM, EN, ISO 9001, and other international standards. Certificates are provided with orders.
Q3: What is the typical lead time for orders?
A: Typically, the lead time is 15-45 days for standard orders, depending on the specific quantity and technical requirements.
Q4: How is the quality of the pipes controlled?
A: We implement strict checks from raw materials to finished products. Mill Test Certificates and third-party inspections (SGS, TUV, ABS, BV) are available.
Q5: What shipping and incoterms do you offer?
A: We offer flexible terms including EXW, FOB, CIF, CFR, DDU, and DDP via sea, air, or rail freight based on customer needs.
Q6: Do you provide after-sales and technical support?
A: Yes, we provide a warranty against manufacturing defects and offer full technical support throughout the project lifecycle.

Related Products